Manufacturing & Supply Chain
ML, Data Engineering & Delivery at Scale
Solution Architecture & Integration

A European furniture manufacturer.

Digital Transformation: Boosts Accuracy by 90%

+90% production accuracy
+15% truck-space utilisation
200+ hours saved / month
Boosts Accuracy by 90%

The Challenge

Delivery planning was inefficient and truck space poorly used, causing delays and higher costs. Without real-time production tracking, bottlenecks and errors crept in; manual processes cut accuracy and ate time; systems were disconnected with no real-time link to NAV/Business Central; and limited reporting left the business with poor visibility.

What We Did

We built a custom software platform with advanced truck-packing algorithms to optimise space and reduce transportation costs, real-time production monitoring, and live data synchronisation with NAV/Business Central over RabbitMQ. Interactive Power BI dashboards surface actionable insight and performance metrics, automated workflows save 200+ hours of manual effort a month, and the platform is scalable and intuitive enough to support future growth.

The Impact

Production accuracy up 90%
Truck-space utilisation up 15%
Transportation costs down 15%
200+ hours a month saved through automation
Stronger operational efficiency and better stakeholder decision-making

How We Delivered

Technology stack
Node.js · Express.js · RabbitMQ · Microsoft Dynamics NAV / Business Central · Power BI · AWS.
Team & approach

A 5-member team - a project manager, a UX/UI designer, a lead developer, a mobile app developer and a QA specialist - working agile, with a comprehensive discovery phase analysing workflows and delivery planning, then iterative development.

Inside The Build

Related Case Studies

See all case studies →